4-18. Board Replacement
4-18-1. SV-206 Board Replacement
Outline
Replacement
Mechanical deck removal
Harness connector disconnection
SV-206 board removal
SV-206 board installation
Mechanical deck installation
Adjustment after replacement
Servo system adjustment
Tape running adjustment
Video tracking adjustment
CTL head position adjustment
AT head position adjustment
Preparations
1.
Put the unit into the unthreading end state.
2.
Turn off the power.
3.
Remove the upper frame.
(Refer to the maintenance manual Part 1, Section 1-6.)
4.
Remove the bottom plate.
(Refer to the maintenance manual Part 1, Section 1-6.)
Tools
.
Torque screwdriver (3 kg
.
cm):
J-6325-400-A
.
Torque screwdriver bit (for M1.4):
J-6325-110-A
.
Torque screwdriver bit (for M2):
J-6325-380-A
.
Hexagonal bit:
J-6326-120-A
4-18. Board Replacement
4-18-1. SV-206 Board Replacement
Summary of Contents for BVW-55
Page 4: ......
Page 8: ......
Page 50: ...1 40 BVW 55 1 2 3 4 5 6 7 8 9 d l s d l 1 15 Fixtures and Adjustment Equipment List ...
Page 58: ......
Page 106: ......
Page 116: ......
Page 130: ......
Page 148: ......
Page 154: ......
Page 158: ......
Page 169: ...1 9 BVW 55 P2 1 2 Fixtures and Adjustment Equipment List 1 2 3 4 5 6 7 8 9 d l s d l ...
Page 176: ......
Page 272: ......
Page 384: ......
Page 392: ......
Page 396: ...1 2 BVW 55 ...
Page 666: ......
Page 705: ......
Page 752: ......
Page 780: ......
Page 805: ......
Page 848: ......
Page 856: ......
Page 870: ......
Page 884: ......
Page 904: ......
Page 909: ...5 27 b BVW 55 5 27 b CN101 CN301 CN302 CN303 CN901 MB 838 B SIDE SUFFIX 12 MB 838 MB 838 ...
Page 911: ...5 27 a BVW 55 5 27 a CN101 CN301 CN302 CN303 CN901 MB 838 B SIDE SUFFIX 11 MB 838 MB 838 ...
Page 940: ......