4-37
BVW-55 P2
4-10. S Tension Regulator Arm Assembly Replacement
Outline
Replacement
S tension regulator arm assembly removal
S tension regulator arm assembly installation
S tension regulator guide cleaning
Adjustment after replacement
S tension regulator offset/gain adjustment
Tape running adjustment
Preparations
1.
Put the unit into the unthreading end state.
2.
Turn off the power.
3.
Remove the upper frame.
(Refer to the maintenance manual Part 1, Section 1-6.)
4.
Remove the cassette compartment.
(Refer to the maintenance manual Part 1, Section1-7.)
Tools
.
Torque screwdriver (3 kg
.
cm):
J-6325-400-A
.
Torque screwdriver bit (for M1.4):
J-6325-110-A
.
Cleaning cloth (15 cm
x
15 cm):
3-184-527-01
.
Cleaning liquid:
9-919-573-01
4-10. S Tension Regulator Arm Assembly Replacement
Summary of Contents for BVW-55
Page 4: ......
Page 8: ......
Page 50: ...1 40 BVW 55 1 2 3 4 5 6 7 8 9 d l s d l 1 15 Fixtures and Adjustment Equipment List ...
Page 58: ......
Page 106: ......
Page 116: ......
Page 130: ......
Page 148: ......
Page 154: ......
Page 158: ......
Page 169: ...1 9 BVW 55 P2 1 2 Fixtures and Adjustment Equipment List 1 2 3 4 5 6 7 8 9 d l s d l ...
Page 176: ......
Page 272: ......
Page 384: ......
Page 392: ......
Page 396: ...1 2 BVW 55 ...
Page 666: ......
Page 705: ......
Page 752: ......
Page 780: ......
Page 805: ......
Page 848: ......
Page 856: ......
Page 870: ......
Page 884: ......
Page 904: ......
Page 909: ...5 27 b BVW 55 5 27 b CN101 CN301 CN302 CN303 CN901 MB 838 B SIDE SUFFIX 12 MB 838 MB 838 ...
Page 911: ...5 27 a BVW 55 5 27 a CN101 CN301 CN302 CN303 CN901 MB 838 B SIDE SUFFIX 11 MB 838 MB 838 ...
Page 940: ......