5-12 (E)
BVP-E30/E30P M-V1
TP501
TP502
TP503
TP1
E501
E1
11
10
9
8
7
6
5
4
3
2
1
M
L
K
J
H
G
F
E
D
C
B
A
DPR-261 board (A side)
TP800
E2
5-4-3. TEST OUT Level Adjustment
Equipment : Waveform monitor, vectorscope
Test Point :
TEST OUT connector
Preparations
.
Turn the power off, and then disconnect the CCU
connected to the camera, and connect the AC-550/
550CE to the camera.
.
OUTPUT/DCC switch (on the side panel)
→
BARS/OFF
.
Menu setting
MENU : SERVICE
PAGE :
VA TRINNING
ITEM :
TEST OUT
→
Y
Adjustment Procedures
1.
Test Out Level Adjustment
Adjustment Point
.
PAGE :
DPR TRIMMING
.
ITEM :
TEST OUT LEVEL
Specifications : NTSC : A = 100
±
0.5 IRE
PAL :
A = 700
±
7 mV p-p
After the adjustment is completed, store the TRIM-
MING data.
(Press the MENU SELECT knob to execute.)
ITEM : STORE
A
A
(NTSC)
(PAL)
(Waveform monitor)
(Waveform monitor)
3.
B-Y level Adjustment
Test Point :
TP501 (GND: E501) /DPR-261
Adjustment Point
.
ITEM :
B-Y LEVEL
Specifications : NTSC : A = 700
±
2 mV
PAL :
A = 525
±
2 mV
4.
After the adjustments are completed, store the TRIM-
MING data.
(Press the MENU SELECT knob to execute.)
ITEM : STORE
A
A
(NTSC)
(PAL)
(Oscilloscope)
(Oscilloscope)