The following figure summarizes the connections in the StorEdge Connection Unit:
Figure 16: The StorEdge Connection Unit connections
Installing the 9V Battery
The 9V battery is supplied with the
inverter
accessories.
1. Open the four internal screws securing the transparent cover to the StorEdge Connection Unit
enclosure and remove the cover.
2. Install the 9V battery in the holder on the top board of the StorEdge Connection Unit and connect it
to the battery pad.
Figure 17: The battery holder
SolarEdge
-
StorEdge Installation Guide MAN-01-00262-1.0
28
Installing the 9V Battery