3. Activate the inverter according to the activation instructions supplied in the inverter package:
a. Verify that the card S/N matches the inverter S/N.
b. Insert the card into the slot marked "
CARD
" on the communication board.
c. Turn AC ON.
d. LCD shows:
Running Script...
è
Done!
e. If LCD shows:
Script error
, contact SolarEdge Support.
Figure 27: Activation card
4. Verify that the inverter is configured to the proper country: Press the LCD light button until reaching
the ID status screen:
I D : # # # # # # # # # #
D S P 1 / 2 : 1 . 0 2 1 0 / 1 . 0 0 3 4
C P U : 0 0 0 3 . 1 4 x x
C o u n t r y : U S A 1
5. If required, perform the following additional steps before closing the inverter cover:
l
Country settings or inverter configuration using the internal LCD user buttons – refer to
Country
and Grid
on page 45.
l
Communication options connection – refer to
Setting Up Communication to the Monitoring Portal
on page 71.
l
StorEdge application configuration - refer to
System Configuration
on page 62.
6. Close the inverter cover by tightening the screws with a torque of 9.0 N*m/ 6.6 lb*ft. For proper
sealing, first tighten the corner screws and then the two central screws. The following figure
illustrates recommended order:
Figure 28: Tightening order of the screws
7. Make sure the AC Bypass switch is switched to the left (position 1).
SolarEdge
-
StorEdge Installation Guide MAN-01-00262-1.0
56
Step 1: Activating the System