![SolarEdge storedge Installation Manual Download Page 70](http://html.mh-extra.com/html/solaredge/storedge/storedge_installation-manual_1313747070.webp)
to display the Meter status screen:
I m p o r t M e t e r
S t a t u s : < O K >
T o t a l [ W h ] : X X X X X X X
3. Press the inverter LCD light button to display the Smart Energy Management and the battery status
screens, and check that:
o
The State the battery is
Discharging
(assuming the load consumption > PV production and AC limit
of inverter > PV production) - The loads are powered by the PV and the battery; if the test is
performed at night, the loads are powered only by the battery.
o
The PWR value is greater than 0
o
B S N : X X X X X X X X X I D : 2 4
S O E : 8 9 %
W W W W W
P W R : 2 W
T o t a l : < X > W h
S t a t e : D i s c h a r g i n g
S i t e L i m i t :
7 . 0 k W
S i t e P r o d :
1 0 . 0 k W
S i t e E x p o r t :
4 . 0 k W
S e l f - c o n s u m e :
6 . 0 k W
4. While the modules are exposed to sunlight , verify that the battery is operating properly:
a. Minimize the house load consumption by turning off all the load circuit breakers, except for the
inverter.
b. Press the external LCD light button to display the battery status screen, and check that:
l
The battery State is: Charging
l
The SOE percentage is increasing
l
The PWR value is greater than 0
B S N : X X X X X X X X X I D : 2 4
S O E : 8 9 %
W W W W W
P W R : 2 W
T o t a l : < x > W h
S t a t e : C h a r g i n g
To check Backup:
1. Disconnect the AC power by shutting off the AC at the main distribution panel. The inverter should
disconnect from the grid, and continue supplying power to the backed-up loads.
Switching to Backup mode takes a few seconds. The LCD screen will show tha Backup mode is ON:
V a c [ V ] V d c [ V ] P a c [ W ]
2 4 0 . 7 3 7 1 . 9 2 3 4 9 . 3
P _ O K : X X X / Y Y Y < S _ O K >
B a c k u p M o d e O N
Chapter 9: System Configuration
SolarEdge
-
StorEdge Installation Guide MAN-01-00262-1.0
69