Installation Workflow
When installing the StorEdge system, follow this workflow to ensure all the components are connected
and functioning correctly.
Step 1
-
PV system installation
- modules, power optimizers and inverter:
l
Power optimizers - as described in
Installing the Power Optimizers
on page 10.
l
Inverter - as described in
Installing the Inverter
on page 17.
Step 2
-
SolarEdge Auto-transformer and AC load panel installation (required for Backup Power
only)
: Refer to
Auto-transformer and Backed-up Loads Panel Installation (for Backup Only)
on page 24.
Step 3
-
Electricity Meter installation (required for Smart Energy Management)
. Refer to
Electricity
Meter Installation
on page 26.
Step 4
-
Connect the battery to the inverter and mount the battery
1
. Refer to the installation
information in the manufacturer documentation, and to
StorEdge Inverter Connections
on page 27.
Step 5 - Connect all components to the inverter
- connect the auto transformer and loads (AC), PV
strings (DC), and meter. Refer to
StorEdge Inverter Connections
on page 27.
Step 6 - Commissioning the inverter
- Activate the system and pair the power optimizers. Refer to
Commissioning the Installation
on page 55.
Step 7
-
Configuring the StorEdge application
. Refer to
Configuring StorEdge Application
on page 65.
Step 8
-
Connecting communication between the inverter and monitoring portal
. Refer to
Setting Up
Communication to the Monitoring Portal
on page 71.
The following flowchart appears throughout this Installation Guide to assist with the installation steps:
1
To gain better accessibility to the battery connection panel, it is recommended to connect the battery cables
before
mounting it on the wall.