NOTE:
The following stty settings are recommended for the client serial device when
accessing the CPU serial console.
-parenb -parodd cs8 -hupcl -cstopb cread clocal -crtscts ignbrk -brkint -
ignpar -parmrk -inpck -istrip -inlcr -igncr -icrnl ixon -ixoff -iuclc -
ixany -imaxbel -iutf8 -opost -olcuc -ocrnl -onlcr -onocr -onlret -ofill -
ofdel nl0 cr0 tab0 bs0 vt0 ff0 -isig -icanon -iexten -echo -echoe -echok
-echonl -noflsh -xcase -tostop -echoprt -echoctl -echoke
4.3.5
4.3.5 Connection of a USB Device
If using a USB 3.0 device (for example, a thumb drive) via one of the front panel USB ports,
the device should be plugged directly into the front panel port if possible or with a short
cable if necessary. Long cables on the USB 3.0 port may adversely affect signal quality and
operation of the USB device.
4.3.6
Power Up
Before powering on the system, make sure that it was not stored where moisture could form
inside the unit. If it was, make sure the system is located in an environment in which it can
completely dry and reach room temperature before applying power.
The BMC automatically powers up the CPUs after it boots, this is the default. If the system
is changed from autonomous boot to power-button boot, then payload power must be
enabled manually. To manually switch on the main power, press
PWR
at the Extreme Edge
Server front panel for a brief time. A tool similar to a pen or stylus is needed.
NOTE:
Fans spin up and then spin down after a while. The main CPUs of the Extreme
Edge Server boot up. Allow booting to complete. Boot time may vary depending on
conditions.
4.4
Removal
The following subsections describe the procedures for removing the server from a rack or
cabinet.
4.4.1
Power Down the Server
For data integrity reasons SMART EC recommends to save data and close all applications
before power down.
Perform the server power down via the BMC's web interface or by pressing the power
button on the I/O panel. This guarantees a clean shutdown of all system circuitry.
Summary of Contents for MC1600
Page 1: ...MC1600 Extreme Edge Server Installation and Use P N 6806870A02B January 2020...
Page 8: ...List of Figures 8 MC1600 Extreme Edge Server Installation and Use 6806870A02B...
Page 24: ...24 MC1600 Extreme Edge Server Installation and Use 6806870A02B Safety Notes Safety Notes...
Page 125: ...1...