![Siemens SINAMICS V50 Operating Instructions Manual Download Page 79](http://html.mh-extra.com/html/siemens/sinamics-v50/sinamics-v50_operating-instructions-manual_385614079.webp)
Repair and maintenance
78
SINAMICS V50 converter
Operating Instructions, 04/2022, FW V1.0, A5E44777205B AB
8.2 Periodic Maintenance
It needs to perform periodic inspection on the drive once every three to six months
according to the application environment and work conditions.
Item
Inspection
content
Inspection method
Inspection criteria
Drive
Main circuit
terminal
Screwdriver/sleeve The screws are tightened and
the cables are kept well.
PE terminal
Screwdriver/sleeve The screws are tightened and
the cables are kept well.
Control circuit
terminal
Screwdriver
The screws are tightened and
the cables are kept well.
Internal wiring
and connectors
Screwdriver and
hands
Connection is firm and
reliable.
Expansion card
connector
Screwdriver and
hands
Connection is firm and
reliable.
Mounting screws
Screwdriver/sleeve
The screws are tightened.
Cleaning the dusts
and powders
Cleaner
There are no dusts and
wools.
Internal foreign
objects
Visual check
There are no foreign objects.
Motor
Insulation test
500VDC
megohmmeter
Normal
8.3 Component Replacement
Different types of components have different service span. The service spans of the
components are subject to the environment and application conditions. Better
working environment may prolong the service lives of the components. The cooling
fan and electrolytic capacitor are vulnerable components and shall be conducted
routine inspection as per the table below. If any fault occurs, please conduct
immediate replacement
Summary of Contents for SINAMICS V50
Page 1: ...SIEMENS ...