Commissioning
4.4 Commissioning with the BOP-2
Inverter with CU240B-2 and CU240E-2 Control Units
72
Operating Instructions, 07/2010, FW 4.3.2, A5E02299792B AA
Menu
Remark
2.
S
0,1530
Minimum motor speed.
2.
S
5$0383
Motor ramp-up time.
2.
S
5$03':1
Motor ramp-down time.
2.
),1,6+
Confirm that the basic commissioning has been completed (Parameter p3900):
NO → YES → OK
Identifying motor data
Alarm A07791 is output as long as the inverter has not identified the motor data. You must
switch on the motor (e.g. from the BOP-2) to identify the motor data. The inverter switches
off the motor after the motor data identification has been completed.
CAUTION
Motor data identification for dangerous loads
Secure dangerous plant and system parts before starting the motor data identification, e.g.
by fencing off the dangerous location or lowering a suspended load to the floor.
4.4.6
Additional settings
After basic commissioning, you need to carry out further settings in your inverter.
In the section Typical commissioning scenarios (Page 55) we recommend a certain
procedure to adjust your inverter to your application.