Configuration in STEP 7
5.1 Overview
TIM DNP3
80
System Manual, 12/2015, C79000-G8976-C253-04
Assigning parameters to the TIM
If you double-click on the TIM module, you open the parameter assignment dialog for the
TIM. You can then specify the required properties in a series of tabs.
Image 5-3
S7-300 station with installed TIM and TIM parameter assignment dialog
Setting parameters for networks and network nodes
The next step is to connect the various stations in a WAN. This part of the configuration is
done with the
NetPro
STEP 7 program.
If you are using an IP-based WAN, take a normal Industrial Ethernet from the NetPro
catalog. The classic WAN "DNP3 dedicated line" can also be taken from the NetPro catalog.
These networks have been added to the "Subnets" folder.
Summary of Contents for SIMATIC TIM 3V-IE DNP3
Page 12: ...Table of contents TIM DNP3 12 System Manual 12 2015 C79000 G8976 C253 04 ...
Page 311: ...Approvals TIM DNP3 System Manual 12 2015 C79000 G8976 C253 04 311 ...
Page 312: ......
Page 350: ...Glossary TIM DNP3 350 System Manual 12 2015 C79000 G8976 C253 04 ...
Page 354: ...Index TIM DNP3 354 System Manual 12 2015 C79000 G8976 C253 04 ...