
5-
©
Siemens AG 2010 All Rights Reserved
SICLOCK
®
TC100 Operating Instructions
Mounting
5
5.1
Overview of mounting
Figure 5-1 SICLOCK TC100 - view of mounting
SICLOCK TC100 must be mounted in an easily accessible position in the control
cabinet.
The housing can be fixated by snap-on mounting to a standard mounting rail
(EN 50022-35)
or to a
SIMATIC S5 DIN rail (6ES5 710-8maxx)
.
A clearance of 100mm must be maintained above the device so that it can be
hooked in and out, and to facilitate unimpeded heat dissipation.
A clearance of at least 100mm must be maintained under the device for the pro-
cess signal plug.
We recommend mounting a suitable cable channel below this clearance.
See also
Dimension drawing
(Chapter 14).
Note
Ensure that the snap-on mounting is locked correctly.
Summary of Contents for SICLOCK TC100
Page 1: ...SICLOCK s SICLOCK TC100 Plant Central Clock Operating Instructions 11 2012 ...
Page 5: ...Preface Preface 4 Siemens AG 2010 All Rights Reserved SICLOCK TC100 Operating Instructions ...
Page 33: ...Mounting 5 3 Siemens AG 2010 All Rights Reserved SICLOCK TC100 Operating Instructions ...
Page 43: ...Connection 6 4 Siemens AG 2010 All Rights Reserved SICLOCK TC100 Operating Instructions ...
Page 101: ...Technical data 13 Siemens AG 2010 All Rights Reserved SICLOCK TC100 Operating Instructions ...
Page 113: ...ESD guidelines B 11 Siemens AG 2010 All Rights Reserved SICLOCK TC100 Operating Instructions ...
Page 121: ...Glossary D 1 Siemens AG 2010 All Rights Reserved SICLOCK TC100 Operating Instructions ...
Page 124: ...Siemens AG Industry Sector Postfach 48 48 90026 NUREMBERG GERMANY www siemens com siclock ...