Page 1 of 14
Mammomat 1000/3000
Solna, Sweden
Rev. 03
11.99
SPS-UD
Installation and Start-Up
Cable connections
5
EMC measures
5
The following measures are required to ensure electromagnetic compatibility of the equip-
ment.
EMC measures at the cable entry
5
Fitting the hose clamps and ferrite sleeves
5
1.
Lay the cable harness from the stand to the generator and leave approximately
3 cm of the shielding at the U-bracket, see Fig. 1.
Stow away excessive cable lengths as shown in Fig. 2.
Fig. 1
Cables from the stand
MAM00100
3cm