9 - 1
Siemens-Elema AB
Register 3
SP B7-230.033.07
Page 1 of 2
Mammomat 1000/3000
Solna, Sweden
Rev. 03
11.99
SPS-UD
Installation and Start-Up
Checks without high voltage
9
Checks without high voltage
9
1.
System "OFF".
2.
On P.C. board D702 set switch S1 (UZW) to "ON" (upper position) and switch S2
(SS) to "OFF" (lower position).
3.
System "ON".
4.
Insert a cassette.
5.
Press the exposure buttons on the control panel. The rotating anode shall start up.
At the end of the limit time, the rotating anode is braked.
6.
Release the exposure buttons.
7.
System "OFF".
The cassette must be removed and reinserted after each
exposure to allow for the next exposure release. This is to avoid
double exposures.
NOTICE