Installation and Start-Up
Installing the generator and the stand
4
Arranging the components
4
Position the stand and the generator in accordance with installation plan and Fig. 1 below.
Cable duct (1) and generator (3) with radiation shield (2) can be installed optionally to the
left or to the right of the the stand. The cables can also be laid underfloor. Maximum cable
length between stand and generator is approximately 3.5 m.
Radiation shield (2) at right angles to the swivel-arm system and centered to the focus
mark (4) on the tube-head cover according to Fig. 1.
Recommended minimum distance to wall and generator base plate respectively is
700 mm (shorter distances may be used at the customer´s desire, if in compliance with
local regulations).
For the installation of the cable duct, a minimum distance of 180 mm between wall and
stands is required.
Notes on installations with separate generator and separate control console
4
- The separate generator can be installed in any suitable place. The maximum distance
of 3.5 m (maximum cable length) to the stand must be maintained, however. If
separately installed, the generator must be bolted to the floor alternatively be attached
to the wall by means of wall brackets, see further Chapter 19 "Bolting the stand/
generator to the floor".
- The separate control console can be installed in a suitable place (wall-mounted or
mounted on a table, for example in an adjacent room with radiation-proof window), or
be mounted onto the free-standing radiation shield (option). The connection cable to
the generator measures 10 m.
Fig. 1
Installation, top view
640
1400
700
700
700
700
540
1091
180
708
1
2
3
MAM00503
4
90