24
8014084/ZWT7/V3-1/2020-06 | SICK
O P E R A T I N G I N S T R U C T I O N S | TRANSIC111LP
Subject to change without notice
3
INSTALLATION
Installing the sample gas cell
Dimensions of the TRANSIC111LP with sample gas cell,
bracket and sample gas cell”, page 99
When a TRANSIC111LP with sample gas cell is ordered, it is delivered with the cell fixed at
the factory and prepared for wall fitting.
▸
Take the sample gas cell off to check and replace the filter.
1
Loosen the bayonet tube screw fitting and remove the sample gas cell by turning it
and pulling it off the TRANSIC111LP,
.
2
Refit the bayonet screw fitting in the reverse sequence.
Ensure the seal is located between the sample gas cell and measuring device
enclosure. The Swagelok connections must point directly downwards.
Fig. 9: Removing the sample gas cell