(1)
()
(3)
(1)
(3)
(4)
(1)
()
(a)
6
During this procedure be careful not to twist the chain.
Therefore
do not lift the parts - slide them along the floor.
1.
The operator is laying unpacked in front of you. The motor-
head unit is on your right hand side.
2.
Lay part (1) to the front.
3.
Fix through pushing the C-profile coupling piece () over it all
the way home.
4.
Slide C-rail part (3) in front of part (1)
5.
Set part (3) in the C-rail coupling piece (4) at an angle, inserting
it from above as shown.
6.
Press down part (3) to tension the chain.
7.
Turn around the operator and screw in the milled nuts into the
C-rail coupling pieces.
Your operator now is readily premounted for installation.
The chain has been pretensioned in the factory;
do not change
the chain tension!
ATTENTION:
The TS Solar/TS Akku is equipped with a fully automatic measure-
ment for the required running length. When shipped the opera-
tor is programmed with a standard running length for factory
testings.
If you want to run the operator for testing purposes you must
fix the blocks inside the c-rail by tightening the screws.
A test
run may only be done after making sure, that the blocks
are fixed properly. Otherwise damaged might apply to the
operator!
Pre-Mounting the operator
Installation
Installing the operator
Minimum head room above the door
Meassure the distance between the ceiling and the highest point
reached by the garage door (1).
The minimum-headroom necessary for mounting the operator is
35 mm. If there is less headroom please pay attention to page 5.
The front fixing angle can be mounted either at the lintel or at the
ceiling.
1.
Meassure the middle of your garage door and make a mark on
the lintel and the top of your door (+a).
2.
Fix the front fixing angle in the middle either at the lintel or at
the ceiling. (We recommend the lintel if possible) (+a).
Summary of Contents for TS Akku II
Page 24: ...24...