Content
Information and Remarks
Important Information for the Installer 3
Directives and Regulations
Use of the operators
Garage Doors
The installers declaration of conformity
Older Garage Doors
Instruction for the users
Security Advises for the Installation 4
Installation
Different Conditions for Installation 5
Minimum space above the garage door
C-Rail Extension
Door Arm Extension
Pre-Mounting the operator 6
Installing the operator 6
Minimum head room above the door
Adjusting the running-length blocks 8
The Emergency Release 9
When the garage door is the only entrance
When there is a second entrance to the garage
The Solar Components
Mounting the Shelf 10
Using and Recharging the batteries 10
Usage
Battery Status
Using and Recharging the Batteries 11
Recharging the battery with the charger
Duration of the recharging process
Possible errors during the recharging process
Printed Circuit Board: Adjustments and Connections
Before Usage: Connecting the Battery Cable 12
Devices for Adjustments 12
TEST-Button (1)
LEARN-Button ()
Combined TEST + LERN button functions
Programming Running-Length and Force 13
Information
1.) Adjusting the running-length blocks
.) Starting the programming-mode
3.) Start the learning-cycle
Quick Reference
Special Functions 14
Readjusting the time for the internal light
Setting the pre-warning ON/OFF
Programming the Soft-Modes
The BOTTOM Soft-Stop
Programming the BOTTOM Soft-Mode
Disabling the TOP Soft-Modes
External Connections 16
Push Button and Key Switch
1V DC Supply
Receiver-Module
Advanced Connections 16
Photocell without self-test
Photocell with self-test
Safety-Beam, Hatch-Door and Emergency Stop
Opto Sensoric Components
DIP-Switches 17
TOP Soft-Mode enabled/disabled
Force during the last 500mm before reaching closing limit
Side Hinged Door
Remote Control
Programming the Hand Transmitters 18
Basics
Programming Transmitter and Receiver
Clearing the receivers‘ memory
Additional Information 19
Using the remote-control
Criterias influencing the range
Use with a HomeLink© System
Technical Information
Technical Data 20
Wiring 20
Messages from LED-lamps and operators lighting 21
Status Messages
Error Messages
Messages from the red LED-lamp and the operators lighting
Additional Messages only from the red LED lamp
Summary of Contents for TS Akku II
Page 24: ...24...