11
3.5.2. Operation area
For the operation of this machine, secure a minimum area of 2.6m (8.5ft) (W) x 3.0m
(9.8ft) (D). In order to prevent injury resulting from falls/accidents during game play, be
sure to secure the minimum area for operation.
Be sure to provide sufficient space (20cm minimum) so as to allow this product's
ventilation fan to function efficiently. To avoid machine malfunctions or fires, do not place
any obstacles near the ventilation opening.
Do not allow objects to block the ventilation ports. It can cause generation of heat and a
fire.
SEGA shall not be held responsible for damage or compensation for damage to a third
party, resulting from the failure to observe this instruction.
3.6. Assemble the machine
When carrying out the assembly work, follow the procedure in the following sequence.
STEP 1
Assemble the machine.
STEP 2
Leg levelling procedure.
STEP 3
Billboard installation procedures.
STEP 4
AC wiring and connection procedure.
Note that the parts contained within the installation kit are required for the assembly work.
Fit all fixings loosely first as detailed in step 1, then position all components before
finally tightening fixings at step 4.
QUALIFIED SERVICE PERSONNEL should only carry out this operation.
Summary of Contents for HOUSE OF THE DEAD 4 SUPER DELUXE
Page 18: ...15 Ensure adequate ventilation is maintained as detailed below...
Page 103: ...100 10 15 Display internal test pattern...
Page 105: ...102...
Page 121: ...118 3 Disconnect the two connectors 4 Remove the six screws from the side of the projector...
Page 124: ...121 9 After exchanging the LED board enter TEST Mode and perform a lighting test...
Page 145: ......
Page 146: ......
Page 147: ......