Date Code 20011009
SEL-701-1 Monitor
Commissioning
Selected Functional Tests
6.21
Accuracy Test, Delta Voltages
Step 1.
Connect the current sources to the IA, IB, and IC current inputs
(5 A or 1 A, as indicated by the ITAP setting). Connect the voltage
sources to the voltage inputs in delta configuration. Refer to
.
Step 2.
Using the front-panel Set Monitor\Monitor Elements\General Data
function or serial port
SHOW
command, note the CTR, PTR, and
PHROT settings.
Step 3.
, set the current and voltage
source magnitudes. The phase angles you should apply depend on the
PHROT setting. Use the front-panel Meter Values\Instantaneous
Meter function to verify the monitor measurements.
Table 6.17
Power Measuring Accuracy Test Values, Delta Voltages
Applied Currents
and Voltages
Real Power (kW)
Reactive Power
(kVar)
Power Factor
(pf)
PHROT = ABC
Expected
:
Expected
:
Expected
:
lag
Measured
:
Measured
:
Measured
:
PHROT = ACB
Expected
:
Expected
:
Expected
:
lag
Measured
:
Measured
:
Measured
:
Ia
2.5A
26
°
–
∠
=
P
0.4677
CTR
PTR
•
•
=
Q
0.2286
CTR
PTR
•
•
=
pf
0.90
=
Ib
2.5A
146
°
–
∠
=
Ic
2.5A 94
°
∠
=
Vab
120V 30
°
∠
=
Vcb
120V 90
°
∠
=
Ia
2.5A
26
°
–
∠
=
P
0.4677
CTR
PTR
•
•
=
Q
0.2286
CTR
PTR
•
•
=
pf
0.90
=
Ib
2.5A 94
∠
=
Ic
2.5A
146
°
–
∠
=
V ab
120V
30
°
–
∠
=
Vcb
120V
90
°
–
∠
=
Summary of Contents for SEL-701-1
Page 16: ...This page intentionally left blank ...
Page 18: ...This page intentionally left blank ...
Page 20: ...This page intentionally left blank ...
Page 34: ...This page intentionally left blank ...
Page 118: ...This page intentionally left blank ...
Page 142: ...This page intentionally left blank ...
Page 196: ...This page intentionally left blank ...
Page 210: ...This page intentionally left blank ...
Page 242: ...This page intentionally left blank ...
Page 384: ...This page intentionally left blank ...