Step 17.
If your monitor is equipped with voltage inputs, check the following:
Phase voltage magnitudes should be nearly equal.
Phase voltage phase angles should be balanced and have proper
phase rotation.
The negative-sequence voltage magnitude, V2, and zero-
sequence voltage magnitude, 3V0, if shown, should both be
nearly zero.
NOTE:
If the monitor reports V1 near zero and V2 nearly equal
to VAB/1.74, there is a phase rotation problem. Verify the
monitor ac voltage connections and the phase rotation
setting, PHROT. A nonzero 3V0 meter value, if shown, typically
indicates a single-phase voltage connection problem.
Step 18.
The SEL-701-1 Monitor is now ready for continuous service.
Summary of Contents for SEL-701-1
Page 16: ...This page intentionally left blank ...
Page 18: ...This page intentionally left blank ...
Page 20: ...This page intentionally left blank ...
Page 34: ...This page intentionally left blank ...
Page 118: ...This page intentionally left blank ...
Page 142: ...This page intentionally left blank ...
Page 196: ...This page intentionally left blank ...
Page 210: ...This page intentionally left blank ...
Page 242: ...This page intentionally left blank ...
Page 384: ...This page intentionally left blank ...