
Chapter 4 Using
P A S S O F T W A R E
Creating
A N E W S I T E F O R Y O U R M E T E R
62
PM130 PLUS Powermeter Series
Figure
4-1: Configuration Dialog Box – Instrument Setup Tab
2.
Click the
Sites
button on the right-hand-side.
3.
From the
Look in
box, select the directory where a new database will
be stored. By default, it is the
Sites
directory.
4.
Type a site name for your device in the
File name
box, click
New
,
and then click
OK
.
5.
On the
Instrument Setup
tab, select
PM130 PLUS
in the
Model
box. PAS automatically selects the appropriate instrument options for
your meter.
6.
Select a correct CT secondary current (5A or 1A) for your meter.
7.
If you wish to add any comments for your meter, type the comments
in the
Comment
box.