7
1011-530
Figure 2.
V
n
versus
F/P
(Ungrounded Wye Capacitor Bank)
Graphical Method – Example 1
An installation has the following profile:
•
Highest anticipated continuous system line-to-neutral voltage (
V
L-n
): 20 kV
•
Nameplate rating of the capacitor units (
V
r
): 9.96 kV
•
Number of series groups per phase (
S
): 2
•
Number of capacitor units in parallel per series group (
P
): 10
For
F
= 1, enter at 10 on the horizontal scale (1/10 = 10% of capacitor units isolated
from a series group). Follow this up to the curve for
S
= 2 (2 series groups per phase).
Here on the vertical scale,
V
o
= 1.072 per unit.
Similarly, for
F
= 2, enter the graph at 20 on the horizontal scale (2/10 = 20% of capaci-
tor units isolated from the same series group). Follow this up to the curve for
S
= 2.
Here,
V
o
= 1.16 per unit. Because we are looking for a
V
o
of 1.1 or less per unit, our
F
c
in
this example is 2.
With
V
L-n
= 20 kV and 2 series groups per phase, the capacitor units are normally oper-
ated at 10 kV. Therefore: