1011-530
20
Because we are looking for a
V
o
of 1.1 or less per unit, our
F
c
in this example is 2.
Now calculate
U
tp
:
For
F
= 1,
For
F
= 2,
To determine the lockout level, calculate the midpoint value between
U
tp
for
F
= 1 and
U
tp
for
F
= 2 (=
F
c
):
Thus, the desired lockout level for this capacitor bank is 8.19%.
Formula Method – Example 2
An installation has the following profile:
•
Highest anticipated continuous system line-to-ground voltage (
V
L-g
): 139.44 kV
•
Nameplate rating of the capacitor units (
V
r
): 19.92 kV
•
Number of series groups per phase (
S
): 7
•
Number of capacitor units in parallel per series group (
P
): 12
For
F
= 1,
For
F
= 2,
Because we are looking for a
V
o
of 1.1 or less per unit, our
F
c
in this example is 2.
Now calculate
U
tp
:
V
o
(volts)
10
20000
⋅
2 10
2
–
(
)
2
+
--------------------------------
11111 volts
=
=
V
o
(per unit)
11111
9960
---------------
1.1156 per unit (or 11.56% overvoltage)
=
=
U
tp
100
1
⋅
2 10
1
–
(
)
1
+
--------------------------------
5.26%
=
=
U
tp
100
2
⋅
2 10
2
–
(
)
2
+
--------------------------------
11.11%
=
=
5.26%
11.11%
+
2
-----------------------------------------
8.19%
=
V
o
(volts)
12
139440
⋅
7 12
1
–
(
)
1
+
--------------------------------
21452 volts
=
=
V
o
(per unit)
21452
19920
---------------
1.0769 per unit (or 7.69% overvoltage)
=
=
V
o
(volts)
12
139440
⋅
7 12
2
–
(
)
2
+
--------------------------------
23240 volts
=
=
V
o
(per unit)
23240
19920
---------------
1.1667 per unit (or 16.67% overvoltage)
=
=