9
Maintenance
9-42
RUTHMANN-Steiger
®
TB270
BA.GB.12-27409-05-07-FTA-jr
Re-adjust prestressing of retraction chains and extension ropes in case
of a too big chain dip and/or rope slack.
Attention!
A too strong prestressing can lead to the demolition
of the machine. You have to take care that the tele-
scope will not be twisted as a result of the re-
stretching.
Extend the telescope as far as possible with horizontal boom and un-
loaded cage.
Retract the telescope slightly.
Check rope slack of the extension ropes.
Re-stretch extension ropes if necessary.
Re-stretch extension ropes by means of adjustment screw (A
1.1, 1.2
;
A
2.1, 2.2
or A
3.1, 3.2
). A sufficient rope slack must always remain. Pay
attention to regular distances between the boom heads during re-
stretching procedure.
The two extension ropes have to be prestressed approximately
equally so that under operating conditions they will take approxi-
mately the same load. The position of the corresponding rocker
Summary of Contents for 27409
Page 4: ......
Page 12: ......
Page 20: ......
Page 62: ......
Page 104: ......
Page 162: ......
Page 186: ......
Page 211: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 25 ...
Page 246: ......
Page 252: ......
Page 254: ......
Page 255: ...13 Spare Parts BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 13 1 13 Spare Parts ...
Page 256: ......
Page 258: ...14 Appendix 14 2 RUTHMANN Steiger TB270 BA GB 12 27409 05 07 FTA jr ...
Page 260: ......
Page 261: ...BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 14 1 ...