7
Emergency control system
(Emergency Lowering)
BA.GB.12-27409-05-07-FTA-jr
RUTHMANN-Steiger
®
TB270
7-9
Note
First retract all the telescopes completely.
Rotate boom back into its centre position. If necessary
please lift the boom before carrying out the rotation.
Afterward lower the boom.
Should the safety cut-out be annulled through the execution of above-
mentioned movements, it is possible to take the Steiger into normal opera-
tion after having found out for which reason a safety cut-out took place. If it
is not possible to find out the reason or if faults are discovered, the opera-
tion must be stopped immediately. After having eliminated these faults, the
Steiger can be taken into operation once again.
Summary of Contents for 27409
Page 4: ......
Page 12: ......
Page 20: ......
Page 62: ......
Page 104: ......
Page 162: ......
Page 186: ......
Page 211: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 25 ...
Page 246: ......
Page 252: ......
Page 254: ......
Page 255: ...13 Spare Parts BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 13 1 13 Spare Parts ...
Page 256: ......
Page 258: ...14 Appendix 14 2 RUTHMANN Steiger TB270 BA GB 12 27409 05 07 FTA jr ...
Page 260: ......
Page 261: ...BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 14 1 ...