Taking into operation
BA.GB.12-27409-05-07-FTA-jr
RUTHMANN-Steiger
®
TB270
5-1
5
Taking into operation
Attention!
If faults are determined when putting it into operation,
operation must not be started. Operation may only start
after elimination of the faults.
Note
Apart from the following explanations especially the safety
instructions in chapter 1.2 must be observed.
The Ruthmann-Steiger must be checked for roadworthiness and operating
safety each time before it is put into operation.
5.1
Definition of transport and basic position
Transport and basic position are identical.
Position of the components
Component
Position
Stabilizing jacks Jack
front
left
retracted
Jack
front
right
retracted
Jack
rear
left
retracted
Jack
rear
right
retracted
Boom
Turret
centre position
Boom system
in boom rest
Telescope
retracted
Working cage
Door
closed
Summary of Contents for 27409
Page 4: ......
Page 12: ......
Page 20: ......
Page 62: ......
Page 104: ......
Page 162: ......
Page 186: ......
Page 211: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 25 ...
Page 246: ......
Page 252: ......
Page 254: ......
Page 255: ...13 Spare Parts BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 13 1 13 Spare Parts ...
Page 256: ......
Page 258: ...14 Appendix 14 2 RUTHMANN Steiger TB270 BA GB 12 27409 05 07 FTA jr ...
Page 260: ......
Page 261: ...BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 14 1 ...