4
Operating elements and
displays
BA.GB.12-27409-05-07-FTA-jr
RUTHMANN-Steiger
®
TB270
4-23
1.
Proportional valve
Speed regulation
(not to be controlled manually)
1.
Proportional valve
Speed regulation
(not to be controlled manually)
1.
Proportional valve
Speed regulation
(not to be controlled manually)
4.3.5.3.2
Way valves for control of boom and of working cage
The following solenoid valves are situated at turret:
No.
Manual override
left
right
Function
1.
/
Inclination levelling of working cage down or
up.
1.
/
Boom (lifting arm) lowering and lifting.
1.
/
Telescope in or out.
Summary of Contents for 27409
Page 4: ......
Page 12: ......
Page 20: ......
Page 62: ......
Page 104: ......
Page 162: ......
Page 186: ......
Page 211: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 25 ...
Page 246: ......
Page 252: ......
Page 254: ......
Page 255: ...13 Spare Parts BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 13 1 13 Spare Parts ...
Page 256: ......
Page 258: ...14 Appendix 14 2 RUTHMANN Steiger TB270 BA GB 12 27409 05 07 FTA jr ...
Page 260: ......
Page 261: ...BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 14 1 ...