9.0
MACHINE ASSEMBLY
EACH MECHANICAL INTERVENTION MUST BE
CARRIED OUT BY PROFESSIONALLY QUALIFIED
STAFF.
After having freed the various components from the packing check
that they are complete, and that there are no anomalies, then comply
with the following instructions for the assembly of the components
making use of the attached series of illustrations.
9.1
Anchoring system
The packed machine is secured to the support pallet through the
holes prearranged on the frame. Such holes can be used also
to secure the machine to the ground, through floor anchor small
blocks (excluded from supply). Before carrying out the definitive
fastening, check that all the anchor points are laid down flat and
correctly in contact with the fixing surface itself. If not so, insert
shimming profiles between the machine and the fixing lower surface,
as indicated in Fig. 5.
Fig. 5
a = 651 mm / 25.63”
b = 440 mm / 17.32”
• Execute 4 holes with 12 mm diameter on the floor by the holes on
the bottom floor;
• insert the small blocks (excluded from supply) into the holes;
• secure the machine to the ground with 4 M12x120 mm bolts (ex-
cluded from supply) (Fig. 5 ref. 1) (or with 4 12x80 mm stud bolts
(excluded from supply)). Tighten the bolts with an approximate
tightening torque of 70 Nm (52 ft
•
lbs).
• Before clamping completely the machine to the floor, level its rear
part rotating the feet (Fig. 6 ref. 1).
Fig. 6
1