Galaxy A16F-R2431 Installation and Hardware Reference Manual
2-6
Unpacking the Subsystem
CAUTION!
Cables for connecting Fibre Channel devices must be handled with care.
They must not be bent and the routing path must be carefully planned to
prevent emission interference with other interfaces.
7.
Power up:
Once the components have been properly installed and all
cables are properly connected, you can power up the subsystem and
configure the RAID array. (See
Section 4.1
)
2.4.1 Installation Procedure Flowchart
Figure 2-1
shows a flowchart of the installation procedure. As you complete
each step, check off the “
Done
” box on the right. Please use this flowchart
in conjunction with the instructions that follow.
Figure 2-1: Installation Procedure Flowchart
2.5 Unpacking the Subsystem
Compare the
Unpacking List
against the actual package contents to confirm
that all required materials have arrived. Carefully check the items contained
in each box before proceeding with installation.
WARNING!
Do not rely on the non-definitive, summarized unpacking list shown
below--it is for reference only. A detailed, printed copy of packing list can
be found in your product shipping package or product CD.