Introduction
2-1
Chapter 2
Hardware Installation
2.1 Introduction
This chapter gives detailed instructions on how to install hard disk drives
and drive trays into the subsystem. Installation into a rack or cabinet should
occur before hard drive installation. Please confirm that you received all of
the components listed on a printed copy of
Unpacking List
included in the
shipping package before proceeding with the installation process.
CAUTION!
Carefully follow the installation instructions described in this manual to
prevent any difficulties and damages to your system.
2.2 Installation
Prerequisites
1.
Static-free installation environment:
The subsystem must be installed
in a static-free environment to minimize the possibility of electrostatic
discharge (ESD) damage. (See
Section 2.3
)
2.
Component check:
Before installing the subsystem, check to see that
you have received all the required components. (See
Section 2.5
) If any
items appear damaged or are missing, contact your vendor for a
replacement.
3.
Hard drives:
Up to sixteen (16) SATA-II interface hard drives have
been installed into drive trays and are ready for operation. Follow these
procedures for replacing a hard drive if required. (See
Section 2.6
)
4.
Cabling:
All the Fibre optical cables that connect the subsystem to the
hosts should be purchased separately. We recommend using certified
Fibre optical cables and SFP transceivers from Rorke Data to avoid
compatibility problems. Please see
Chapter 3
for sample topologies and
configuration options. Please contact your vendor or Rorke Data for the
list of compatible cables.