Revision Record
Revision
No.
Date
Description of changes
Approval
Issured
0
2011.7.8
First Edition
Hoshi
Misako
1
2011.7.25
4-15 MEDIA THICKNESS CHECKING SENSOR ADJUSTMENT has been
revised.
Hoshi
Umemoto
2
2011.9.15
5-2 SENSOR MAP has been revised.
Hoshi
Misako
3
2011.10.6
1-3 HEAD CARRIAGE has been revised.
Hoshi
Misako
4
2011.10.19
1-3 HEAD CARRIAGE parts has been added.
1-13 RU-640, 1-14 MB-640 have been added.
Hoshi
Misako
5
2011.12.21
1-6 PINCH ROLLER, 2-1 WIRING MAP parts has been revised.
Hoshi
Misako
6
2012.2.1
1-12 ACCESSORIES, 1-13 RU-640, 1-14 MB-640,
5-1 SPECIAL TOOLS have been revised.
Hoshi
Umemoto
7
2012.2.10
1-12 ACCESSORIES has been revised. Hoshi
Umemoto
8
2012.3.1
1-9 INK SYSTEM parts have been revised.
Hoshi
Yuko
9
2012.5.25
1-4 DRIVE UNIT Parts have been revised.
Hoshi
Yuko
10
2012.9.28
1-3 HEAD CARRIAGE has been revised & added.
1-9 INK SYSTEM parts has been revised
Hoshi
Yuko
11
2012.11.15
1-5 CHASSIS, 4-1 SERVICE MODE,
7-1 INSTALLATION CHECK LIST have been revised.
Onoda
Yuko
12
2012.12.20
1-9 INK SYSTEM parts have been revised.
Onoda
Yuko
13
2013.2.13
3-21 UV LAMP FILTER REPLACEMENT has been added.
6-14:SERVICE CALL, 7-1 INSTALLATION CHECK LIST,
7-2 MAINTENANCE CHECK LIST has been revised.
Onoda
Wakana
14
2013.2.28
1-13 RU-640, 1-14 MB-640 has been added.
Onoda
Yuko
Summary of Contents for VersaUV LEJ-640
Page 32: ...2 4 MAIN BOARD_Arrangement Diagram Soldering Side ...
Page 43: ...2 15 HEAD BOARD_Arrangement Diagram Soldering Side ...
Page 54: ...2 26 SERVO BOARD_Arrangement Diagram Soldering Side ...
Page 63: ...2 35 SUB BOARD B_ Arrangement Diagram Component Side ...
Page 70: ...2 42 2 6 INK SYSTEM BOARD INK SYSTEM_Arrangement Diagram Component Side ...
Page 282: ...4 74 9 Fix the I S Cover I S Cover Hook Screw Screw ...
Page 306: ...7 2 Unpacking ...