Chapter 2 Installation and Setup
35
2-5 Before Starting Operations
Spindle Run-in (Warm-up)
In any of the following cases, perform run-in (warm-up) operation for the spindle. Failure to do so may result in unstable
spindle rotation.
When using for the first time after purchase
After moving the machine and reinstalling it at a different location
After replacing the spindle unit
When using in a low-temperature environment
How to Perform Run-in (Warm-up) Operation
Carry out the following steps 1 through 4.
P. 47, “Starting and Stopping Spindle Rotation”
Step1
Speed : 5,000 rpm
Rotation time : 15 minutes
Step2
Speed : 10,000 rpm
Rotation time : 10 minutes
Step3
Speed : 15,000 rpm
Rotation time : 10 minutes
Step4
Speed : 20,000 rpm
Rotation time : 15 minutes
Summary of Contents for EGX-350
Page 22: ...20...
Page 36: ...34 Chapter 2 Installation and Setup 2 4 Selecting the Language Switch off the power switch OFF...
Page 38: ...36...
Page 96: ...94...
Page 108: ...106...
Page 114: ...Chapter 8 Appendix 112 8 4 Main Unit Specification Dimensions of Outline Unit mm...
Page 119: ...117...
Page 120: ...118...
Page 121: ...119...
Page 122: ...120...
Page 123: ......
Page 124: ...R7 120615...