![Rohde & Schwarz ZVA110 Quick Start Manual Download Page 13](http://html.mh-extra.com/html/rohde-and-schwarz/zva110/zva110_quick-start-manual_1477896013.webp)
Preparing the Analyzer for Use
R&S
®
ZVA
13
Quick Start Guide 1145.1090.62 ─ 10
●
Each test port may be complemented by three pairs of additional connectors used to
test high power devices and extend the dynamic range, see
Generator and Receiver Access"
Maximum input levels
The maximum input levels at all test ports according to the front panel labeling or the data
sheet must not be exceeded.
In addition, the maximum input voltages of the other input connectors at the front and
rear panel must not be exceeded.
The three LEDs above each test port indicate the connector state:
●
The amber LED is on while the connector is used as a source port.
●
The green LED is on while the connector is used as a bidirectional (source and
receive) port.
●
The blue LED is on while the connector is used as a receive port.
It is recommended to use a torque wrench when screwing RF cables on the test port
connectors. Standard IEEE 287 specifies a torque of (1.5
±
0.2) Nm for N connectors,
(0.9
±
0.1) Nm for the microwave connector types.
1.1.7.2
USB Connector
Double Universal Serial Bus connector of type A (master USB), used to connect e.g a
keyboard, mouse or other pointing devices, the Calibration Unit (accessory R&S ZV-Z5x),
a printer or an external storage device (USB stick, CD-ROM drive etc.).
To control external devices (e.g. power meters, generators) via USB connector, a VISA
installation on the network analyzer is required. Use the USB-to-IEC/IEEE Adapter
(option R&S ZVAB-B44) to control devices equipped with a GPIB interface.
The length of passive connecting USB cables should not exceed 1 m. The maximum
current per USB port is 500 mA. See also
chapter 1.3.5, "EMI Suppression"
1.1.7.3
Ground Connector
Connector providing the ground of the analyzer's supply voltage.
Front Panel Tour