Rockwell Automation Publication 2198T-UM002C-EN-P - March 2019
39
Track Installation
Chapter 2
b. Slide the intermediate track section into the left most curved section.
When you slide the sections together, take care not to bend or distort
the projecting rails.
c. Attach the spine bar of the intermediate section to the bottom track
plate of the curved left section by using M8 x 40 SHCS, do not
tighten.
d. Adjust intermediate section as necessary to allow the shoulder screw
holes in the section and the motor module to align.
e. Attach the motor module from the intermediate section to the left-
most curved-section track bottom and top plates by using the
stainless steel M8 x 25 socket head cap screws and shoulder screws,
shoulder Ø10 x 20, thread M8 x 25.
f. Torque motor module socket-head cap screws to 22 N•m
(16.2 lb•ft). Torque shoulder screws to 13 N•m (9.6 lb•ft).
g. Torque the M8 x 40 SHCS screw between the spine bar and
intermediate section to 40 N•m (29.5 lb•ft).
h. Clean the rail screws and apply Loctite 243.
Intermediate Track Section
M8 x 25 SHCS (X4)
M8 x 40 SHCS (X4)
Shoulder Screw,
M8 x 25 (X4)
M5 x 20 SHCS (X22)s
Summary of Contents for iTRAK
Page 1: ...iTRAK System with TriMax Bearings Bulletin 2198T User Manual OriginalInstructions...
Page 6: ...6 Rockwell Automation Publication 2198T UM002C EN P March 2019 Table of Contents Notes...
Page 102: ...102 Rockwell Automation Publication 2198T UM002C EN P March 2019 Chapter 5 Maintenance Notes...
Page 121: ...Rockwell Automation Publication 2198T UM002C EN P March 2019 121 Index Notes...
Page 122: ...122 Rockwell Automation Publication 2198T UM002C EN P March 2019 Index...
Page 123: ......