610 SERIES CANOPY STYLE HEADER
F3
Pub. 16100003 Rev. 6 - SEPTEMBER 2015
Install three more anchors into the backer board in
the middle area of the unit. Install (1) centered into
the backer board based on the unit width, the other
two can be centered in the spaces left between
each end anchor and the center anchor. The three
anchor locations between the mounting brackets
can vary in location by +/-2” max.
11. Once all the anchors are installed. Go back to right
side of the header assembly and release the safety
“U” bolt. Again, release the load of the front bar to
mounting bracket slowly.
12. Once the front bar is self supporting, check the
locations of the curtain corners. Make sure there
are no hang ups of fabric. The header is self
supporting and heavy loads can be seen, it is
important that the corners fit properly. Once, the
corners are correct, bounce the header up and
down slightly. Do this by pushing up the fabric in the
middle of the header from underneath the inside of
the top. This helps pull the fabric around front bar
before curtain face is installed. Do this lightly, push
up front bar maximum of about 1/2”.
WARNING
The header unit is a self supporting
unit and requires proper installation
because of the load imposed on the
frame. Installing less than the
recommended amount of
(5)anchors, changing anchoring
locations and/or insufficient
anchors installation methods will be
dangerous, and have possible unit
failure. Note: Metal sided buildings
are required to have backup plates
installed and/or be installed into
suitable existing building girt or
purlins to sufficiently support the
header assembly for heavy loads
situations.
FIGURE 5
FIGURE 4
Summary of Contents for ELIMINATOR II 610 Series
Page 12: ...610 SERIES SIDE FRAME D5 Pub 56560007 Rev 4 JUNE 2014 FIGURE 5 FIGURE 6 FIGURE 7...
Page 27: ...610 C STYLE CURTAIN OPERATION OF PULL ROPES Pub 28610002 Rev 2 JUNE 2014 G4 FIGURE 5...
Page 38: ...38 Pub ECII 610 Rev 11 September 2015 ELIMINATORTM II COMBOSHELTERTM II 610 SERIES NOTES...
Page 39: ...Pub ECII 610 Rev 11 September 2015 39 ELIMINATORTM II COMBOSHELTERTM II 610 SERIES NOTES...