Reads the temperature of the glue in the vat (this sensor is inside the glue unit). If temperature
exceeds upper range, triggers an alert and cuts off power to the bookbinder.
S58
Glue Level Thermistor
Monitors the amount of glue in the vat (this sensor is inside the glue unit).
S59
Glue Vat Roller Rotation Sensor
Detects rotation of the glue roller to confirm that the motor and roller are operating.
S73
Glue Vat HP Sensor
Detects when the glue vat is at the home position at the rear.
S74
Glue Vat HP Sensor: Front
Detects when the glue vat has reached the farthest point at the front after making the first
pass for gluing (rear to front).
S75
Glue Roller HP Sensor
Detects the home position of the glue applicator roller.
M32
Glue Vat Motor
Drives the gluing unit from front to back, and then back to front below the spine of the
signature as the unit applies glue from the glue vat.
M33
Glue Supply Motor
Drives the rotary feeder that feeds glue pellets (four at a time) from the glue bin to the gluing
unit.
M25
Glue Vat Roller Motor
Rotates the glue vat roller in the gluing unit to stir the glue after it has melted. This rotation
coats the glue applicators that apply glue to the spine of the signature above.
HTR1
Glue Heater
Mounted inside the gluing unit, melts the glue in the gluing unit before the glue is applied
to the spine.
THSW1
Thermostat
Switches off the power supply if it detects abnormally high temperature around the glue
unit (this thermostat is inside the glue unit.
Motor, Sensor Locations
469
6
Summary of Contents for D391
Page 1: ...Perfect Binder Machine Code D391 SERVICE MANUAL 8 December 2010 Revised...
Page 2: ......
Page 32: ...Bookbinder Interior Tape Braces Rear 1 Remove rear cover A x8 1 Installation 30 1...
Page 33: ...2 Remove rear upper cover A x5 3 Remove tape cushion A Perfect Binder D391 Installation 31 1...
Page 50: ...Trimming Unit Tape Right Side 1 Remove front right corner cover x3 1 Installation 48 1...
Page 54: ...Left Side Remove left flat panel A x4 1 Installation 52 1...
Page 55: ...Remove tape cushions A and B Perfect Binder D391 Installation 53 1...
Page 74: ...Relay Unit Installation 1 From the relay unit remove A Strips of tape x2 1 Installation 72 1...
Page 98: ...1 Installation 96 1...
Page 100: ...2 Preventive Maintenance 98 2...
Page 102: ...Top 1 Sub Grip Area Front 2 Sub Grip Area Rear 3 Replacement and Adjustment 100 3...
Page 121: ...Covers Rear Cover 1 Rear cover 1 x8 Rear Upper Cover Common Procedures 119 3...
Page 149: ...4 Remove sensor plate 1 x1 5 Remove 1 x1 2 Bearing x1 Signature Path Exit Unit 147 3...
Page 183: ...17 Remove sensor bracket 1 x1 18 Remove sensor bracket and sensor 1 x1 x1 Gluing Unit 181 3...
Page 218: ...7 Remove the trimmings buffer motor M37 x2 x1 3 Replacement and Adjustment 216 3...
Page 264: ...4 Remove the power supply unit 2 PCB 1 x9 3 Replacement and Adjustment 262 3...
Page 366: ...4 Troubleshooting 364 4...
Page 368: ...5 Service Tables 366 5...
Page 384: ...Signature Path Exit 1 Signature Exit Roller 2 Stacking Roller 3 TE Press Lever 6 Details 382 6...
Page 490: ...MEMO 488 EN...