5. Perform cover transport from the inserter unit (or bookbinder entrance): 1) Signature transport, 2)
Start cover transport after signature has been stacked.
6. Perform book output: 1) Start binding operation, 2) Glue application, 3) Book trimming Once the
stacking tray returns to the signature turnover position, stacking in the tray can resume.
7. Loop to Step 4 above.
• On the SW2 bank SW1, SW2, SW3 set the finished sizes of the signature and cover, and SW5
sets the transport speed of the signature and cover.
• When [PSW1] is pushed to start signature transport and stacking, the size and speed latch.
• The setting of SW6 on the SW2 bank determines whether the cover is fed from the host machine
or the inserter on top of the bookbinder.
• The cover feed source is enabled at power on and cannot be changed as long as the power
remains on.
8. Turn off the system.
Signature, Cover Finished Size Settings (SW1 to 4 on SW2 Bank)
SW2
Signature Size
Cover Size
Finished Size
1
2
3
4
*
*
*
*
A4 LEF
A3 SEF
B5
Up
*
*
*
-
-
-
*
Up
*
*
A4 LEF (Special) SR A3 (SEF)
A4
Up
Up
*
*
Exe LEF
279.4 X 378.3 mm
SEF
STMT
*
*
Up
*
B5 LEF
B4 SEF
A5
Up
*
Up
*
9 X 12 in. LEF
13 X 19.2 in. SEF
LTR
*
Up
Up
*
LTR LEF
LTR SEF
COM
Up
Up
Up
*
A4 LEF
A3 SEF
COM
*
*
*
Up
A4 LEF
A3 SEF
203.0 X 283.0 mm
Up
*
*
Up
LTR LEF
LTR SEF
208.9 X 265.4 mm
*
Up
*
Up
-
-
-
Up
Up
*
Up
Exe LEF
279.4 X 378.3 mm
177.1 X 252.7 mm
*
*
Up
Up
B5 LEF
B4 SEF
175.0 X 243.0 mm
Output Checks
353
4
Summary of Contents for D391
Page 1: ...Perfect Binder Machine Code D391 SERVICE MANUAL 8 December 2010 Revised...
Page 2: ......
Page 32: ...Bookbinder Interior Tape Braces Rear 1 Remove rear cover A x8 1 Installation 30 1...
Page 33: ...2 Remove rear upper cover A x5 3 Remove tape cushion A Perfect Binder D391 Installation 31 1...
Page 50: ...Trimming Unit Tape Right Side 1 Remove front right corner cover x3 1 Installation 48 1...
Page 54: ...Left Side Remove left flat panel A x4 1 Installation 52 1...
Page 55: ...Remove tape cushions A and B Perfect Binder D391 Installation 53 1...
Page 74: ...Relay Unit Installation 1 From the relay unit remove A Strips of tape x2 1 Installation 72 1...
Page 98: ...1 Installation 96 1...
Page 100: ...2 Preventive Maintenance 98 2...
Page 102: ...Top 1 Sub Grip Area Front 2 Sub Grip Area Rear 3 Replacement and Adjustment 100 3...
Page 121: ...Covers Rear Cover 1 Rear cover 1 x8 Rear Upper Cover Common Procedures 119 3...
Page 149: ...4 Remove sensor plate 1 x1 5 Remove 1 x1 2 Bearing x1 Signature Path Exit Unit 147 3...
Page 183: ...17 Remove sensor bracket 1 x1 18 Remove sensor bracket and sensor 1 x1 x1 Gluing Unit 181 3...
Page 218: ...7 Remove the trimmings buffer motor M37 x2 x1 3 Replacement and Adjustment 216 3...
Page 264: ...4 Remove the power supply unit 2 PCB 1 x9 3 Replacement and Adjustment 262 3...
Page 366: ...4 Troubleshooting 364 4...
Page 368: ...5 Service Tables 366 5...
Page 384: ...Signature Path Exit 1 Signature Exit Roller 2 Stacking Roller 3 TE Press Lever 6 Details 382 6...
Page 490: ...MEMO 488 EN...