B
I
PAP
S
YNCHRONY
S
ERVICE
& T
ECHNICAL
I
NFORMATION
1032444, R
EV
. 00
R
EPAIR
& R
EPLACEMENT
- P
AGE
24
F
IGURE
W: F
OAM
P
LACEMENT
7. Install the Buzzer (Refer to page 21 for more detailed instructions).
8. Install the Muffler (Refer topage 19 for more detailed instructions).
9. Install the Blower Assembly (Refer to page 17 for more detailed instructions).
10. Install the Valve Assembly (Refer to page 15 for more detailed instructions).
11. Install the Diffuser Assembly (Refer to page 14 for more detailed instructions).
12. Install the Outlet-Flow Tubing Assembly (Refer to page 12 for more detailed instructions).
13. Install the Main PCA (Refer to page 7 for more detailed instructions).
14. Install the Top Enclosure (Refer to page 5 for more detailed instructions).
Inlet Air
Path Foam
Placement
Exhaust Air
Path Foam
Placement