background image

HANDLER IV

OPERATOR’S

MANUAL

Summary of Contents for IV

Page 1: ...HANDLERIV OPERATOR S MANUAL...

Page 2: ...Safety 7 3 Safety Decal Locations 10 4 Assembly Installation 11 5 Operation 12 Plumbing Package System 3 Package 15 Mixing Dry Packaged Products 17 6 Trouble Shooting 19 7 Parts 21 3 Plumbing Package...

Page 3: ...pair by others in such manner as in our judgement affects the product materially and adversely shall void this warranty Warranty does not apply to any machine or part which has been repaired or altere...

Page 4: ..._____________ Check One Comercial Use ________ Farm Use ____________ Dealer Inspection Report Safety ______ Frame Fasteners Tight ______ Chemical Hoses Tight ______ Engine Has Oil ______ All Decals In...

Page 5: ...Page 4...

Page 6: ...nyone else to operate this equipment until such information has been reviewed Annually review this information before season start up Make these periodic reviews of SAFETY and OPERATION a standard pra...

Page 7: ...the safety operation maintenance and troubleshooting information contained in the Operators s Manual Keep this manual handy for frequent reference and to pass on to new operators or owners Operator O...

Page 8: ...IV batch and When you see this symbol be alert to the personal injury or death Follow the instruction in the safety 3 BIG REASONS Accidents Disable and Kill Accidents Cost Accidents can be Avoided SI...

Page 9: ...ed and understandALL safety and operating instructions in the SAFE operator It is the operator s responsibility to read The most important safety device on this equipment is a the Handler Continue doi...

Page 10: ...ields and guards in place when operating Safety Decals 1 Keep safety decals and signs clean and legible at all times 2 Replace safety decals that are missing or have become illegible 3 Replaced parts...

Page 11: ...ow Location is depicted on the photograph below Good safety requires that you familiarize yourself with the various safety decals the type of warning and the area or the particular function related to...

Page 12: ...make and model of sprayer Valve System Each Handler IV batch and induction tank has been equipped with a plumbing package valve system The user is able to puncture and rinse product jugs while all th...

Page 13: ...ncture and split open the bottom of the product container Fresh water enters the bottom of the container from a line through the side of the eductor tank Valves in the plumbing control the removal of...

Page 14: ...8 Suction Valve 9 Discharge Port To Sprayer 10 Induction Port From Pump 11 Fresh Water Inlet Handler IV with Pump Installed 1 Handler Tank 2 Mounting Subframe 3 Handler Knife Inside Tank Not shown 4...

Page 15: ...reads and understands the operating pro cedures and all related safety precautions outlined in this section A pre operational checklist is provided for the operator It is important for both personal s...

Page 16: ...tent and even force to cut the bottom of the container and to allow it to drain Drainage and rinsing is faster if one or more sides of the container are cut into while puncturing Se Fig 5 4 4 Open Val...

Page 17: ...To fill remainder of tank if applicable open suction valve Valve 1 to draw from nurse tank position and open or keep open valve 3 discharge valve 9 When desired sprayer tank volume is achieved close...

Page 18: ...start nurse pump 3 Turn three way valve valve 1 so it is drawing water from nurse tank Fig 5 3 4 Open one or both valves 4 6 agitation valves and fill Handler tank with appropriate amount of water to...

Page 19: ...sition 12 Turn off pump If tank rinsing is desired then continue to the next step 13 To rinse lines and tank turn valve 1 on to draw from nurse tank 14 Start pump 15 Open agitation valves valves 4 6 a...

Page 20: ...Improper fittings Dull blade Improper handling of jugs Dull blade Solution Check to make sure the venturi has been installed in the proper direction and ensure that the nozzle of the venturi is in pl...

Page 21: ...from sprayer tank by partially closing the valve This will regulate the speed at which product mixture is drawn from the Handler Force water back into the venturi by opening bypass valve This allows w...

Page 22: ...Manifold x 45 HB 1 3 25 M220BRB90 2 Manifold x 90 HB 2 3 25 M220BRB 2 Manifold x HB 1 3 25 M220100CPG 2 x 1 Manifold Coupler 1 Item Part Number Description Quantity 3 25 FC220 2 Worm Screw Clamp 8 3...

Page 23: ...45 HB 1 3 25 M220BRB90 2 Manifold x 90 HB 2 3 25 M220BRB 2 Manifold x HB 1 3 25 M220100CPG 2 x 1 Manifold Coupler 1 Item Part Number Description Quantity 3 25 FC220 2 Worm Screw Clamp 8 3 25 200G 2 E...

Page 24: ...ed Bulkhead 2 5 25 SL200 54 2 MPTxFPT 45 Street Elbow 2 6 25 MBF100 1 FPTxFlange Bolted Bulkhead 1 7 49 62532 15 Hinged Vented Lid 2 8 49 PWRF 15 RotoFlush Tank Flush 1 9 30 60974PHK 3 4 FPT x 90 HB w...

Page 25: ...ided clear PVC pressure side or EPDM suction suction side of system Clamps all stainless steel Lid two 15 diameter polypropylene hinged Height 44 with lid on not including steel subframe 48 with steel...

Reviews: