B
I
PAP
S
YNCHRONY
S
ERVICE
& T
ECHNICAL
I
NFORMATION
1032444, R
EV
. 00
R
EPAIR
& R
EPLACEMENT
- P
AGE
12
O
UTLET
-F
LOW
-T
UBING
R
EPLACEMENT
Procedure
Removed/Installed During Process:
•
Top Enclosure (Refer to page 5 for more detailed instructions.)
•
Main PCA (Refer to page 7 for more detailed instructions.)
•
Outlet-Flow-Tubing Assembly
F
IGURE
L: R
EMOVAL
AND
I
NSTALLATION
OF
THE
O
UTLET
-F
LOW
T
UBING
To remove the Outlet-Flow-Tubing Kit:
1. Remove the Top Enclosure (Refer to page 5 for more detailed instructions on removing
the top enclosure).
2. Remove the Main PCA (Refer to page 7 for more detailed instructions on removing the
Main PCA).
3. Disconnect the Flow Element from the Coupler and remove the Flow Element, Outlet Port,
and Tubing from the unit.
NOTE
This kit comes pre-assembled for easy installation in the device.