City Series CST60E
|
91
installation-power vent
Gas Power Vent Installation-Wiring-End of Line Power Vent
10. Remove front faceplate from power vent unit by removing four screws
as shown below.
11. Loosen four screws in the locations shown below, lifting the rain
guard off them (key hole slots).
12. Inside the power vent box, connect the blue and red wires to the
pressure switch as shown below.
13. Bundle the wires together with the supplied grommet and pop them
into the bracket on the roof of the power vent box.
14. Install the second grommet onto the wires and secure them into a
bracket located on the side of the power vent box.
15. Connect ground wire to ground lug located at back of the power vent box.
16. Connect wires from pressure switch to wires from BX cable--red to red
and blue to blue. Cap paired wires with supplied marrette.
Red Wire
Ground
Blue Wire
Grommet in bracket
Grommet in bracket
Red to Red
Black to Black
Black to White
17. Connect remaining wires from the power vent motor to the BX cable- black
to black and black to white. Cap paired wires with supplied marrette.
18. Reinstall rain guard and tighten screws.
19. Reinstall front faceplate with 4 screws.
NO
TES
• Cut off existing connectors from fan motor and strip back to expose
wires before connecting.
• After exposure to heat, white wires will appear yellow and blue
wires will appear green.
NO
TE
• The power vent cap can be serviced externally or internally. If access
to the exterior is not possible due to height/location of the termination,
it is recommended that an access panel be placed near the rear of
the termination inside of the enclosure where the power vent cap is
located. The access panel should be large/close enough to be able
to service the power vent cap. See maintenance section of manual
to see how servicing is completed internally.
Summary of Contents for City CST60E-LP
Page 125: ...City Series CST60E 125 notes ...
Page 130: ...130 City Series CST60E warranty ...
Page 131: ......