Preparing for Use
R&S
®
QAR
21
User Manual 1178.7200.02 ─ 04
2. Lift the R&S
QAR onto the platform into a stable position and in a right angle to the
floor.
3. Secure the R&S
QAR by screwing the two supports to the platform.
The mounting holes in the platform define the position of the supports.
Four screws secure each support:
● Two socket head screws with a size 10 on the outside.
● Two socket head screws with a size 6 on the inside.
Note:
Insert a washer between screw and support as shown in
.
4. Make sure that all eight screws are screwed on tightly to the platform.
Figure 4-6: Support installation (top view)
4.2.3
Installing the Radome Measurement Elements
Radome measurements require the DUT mounting table and the transmitter module.
Required tools:
●
Allen wrench size 5.
●
Torx wrench size TX20.
●
Power drill (floor installation only).
●
Anchor bolts size 12 mm, for example a Fischer FAZ II 6 (floor installation only).
Installing the DUT mounting table on the platform
You can install the optional mounting table on the platform. The platform has several
mounting holes that you can use to secure the table. The mounting holes you choose
define the distance of the mounting table to the R&S
QAR.
1. Place the mounting table on the platform at the distance you need.
2. Screw the mounting table to the platform with the four socket head screws (size 5).
Installing the R&S
QAR