Maintenance Chart
8 — 103
WK48_025_1301GB
The following tasks must be carried out prior to maintenance work:
Danger
Do not disconnect the delivery line until you have checked the pres-
sure gauge to see whether the system has been successfully de-
pressurised!
You must wear protective goggles.
Turn your face away when opening the line coupling.
Disconnect the delivery line.
Remove all necessary lubrication lines and seal them with
plugs.
Replace the S-transfer tube if the wall thickness has fallen below the
minimum.
Measure the wall thickness of the S-transfer tube.
Maintenance chart:
Checking delivery line and measuring
wall thickness
Remove the mixer shaft.
Maintenance chart:
Agitator
Suspended Load
Use only suitable lifting equipment for lifting components.
Notes
It is advisable to use belts and straps to avoid causing damage.
Preparation
Removing S-transfer
tube