Operation
6 — 30
05_0010_0507GB
Spray clean the hopper carefully with a water hose.
Spray all parts that come into contact with concrete with a
hose.
After cleaning, you should check the seal gap between transfer tube
and wear ring. The gap ”S” must be 1.5 to 2 mm; otherwise the
transfer tube must be readjusted.
Maintenance chart:
Adjusting S-transfer tube
S
2
3
4
1
Item
Designation
1
S-transfer tube
2
Thrust ring
3
Wear ring
4
Wear stay
Check the gap ”S” between transfer tube and wear ring.
Notes
The gap between transfer tube and wear ring must be 1.5 to 2 mm.
Continuation next side
Checking seal gap