![Pulsar Measurement Greyline TTFM 6.1 Instruction Manual Download Page 56](http://html1.mh-extra.com/html/pulsar-measurement/greyline-ttfm-6-1/greyline-ttfm-6-1_instruction-manual_1625415056.webp)
TTFM 6.1 INSTRUCTION MANUAL
56
1 CROSS INSTALLATION OVERVIEW – SE16B Transducers TMK-B21 or TMK-B22 Kit (Cont.)
4. Place the bracket assembly on the pipe, tighten it in place with the two hose clamps. For a horizontal pipe,
position the bracket at 3 or 9 o’clock. Hold the level up to the top of the bracket to ensure the angle is
correct. For vertical pipes, the bracket can be at any orientation about the pipe. Tip: Use a 5/16” nut driver
to tighten the hose clamp.
5. Mark the position of the center line of the bracket which is to be moved to the opposite side of the pipe.
It is up to you to determine which bracket is easier to move from the current position: