![Pulsar Measurement Greyline TTFM 6.1 Instruction Manual Download Page 40](http://html1.mh-extra.com/html/pulsar-measurement/greyline-ttfm-6-1/greyline-ttfm-6-1_instruction-manual_1625415040.webp)
TTFM 6.1 INSTRUCTION MANUAL
40
2 OR 4 CROSS INSTALLATION OVERVIEW – SE16B Transducers TMK-B1 Kit (Cont.)
3. Use alignment bar to ensure the brackets are parallel. Completion of steps 2 & 3 is shown below.
4. Mark the position of the permanent bracket on the pipe. This is the bracket that will not be adjusted and
will be used as the reference for the separation distance and alignment. It is your choice which bracket is
permanent. With a marker, mark the bracket position by placing the mark directly in front of the stainless
side-rail.