PREPARATION FOR THE BEGINNING OF A NEW
FIELDWORK SEASON
Check technical condition of bearings, shields, chains.
Check spreader unit blades and replace them if necessary.
Check technical condition of the electrical system; Check whether lights work
correctly.
Check leaktightness of pneumatic system and hydraulic system.
Check state of wear of hydraulic hoses. Immediately replace worn or damaged
hydraulic hoses.
Check technical condition of PTO shaft, its shields and securing chains.
Check oil level in the spreader unit drive gear and the floor conveyor drive
gear.
Grease all inspection points of the manure spreader,
Check air pressure in tyres,
Check tension of the floor conveyor chain, adjust if necessary.
Check setting of brake lever, adjust if necessary.
Check condition of bolt connections, tighten if necessary.
Check degree of drawbar wear.
Check drawbar and frame for scratches and fractures.
Check state of wear of the floor conveyor mechanism's strips, if necessary
replace them with new ones.
Summary of Contents for NV161/1
Page 2: ......
Page 6: ......
Page 7: ......
Page 8: ......
Page 13: ...SECTION 1 BASIC INFORMATION ...
Page 27: ...SECTION 2 SAFETY ADVICE ...
Page 45: ...SECTION 3 DESIGN AND OPERATION ...
Page 67: ...SECTION 4 CORRECT USE ...
Page 84: ...Pronar NV161 1 NV161 2 NV161 3 NV161 4 NV161 5 SECTION 4 4 18 ...
Page 85: ...SECTION 5 MAINTENANCE ...
Page 131: ...NOTES ...
Page 132: ......