SERIES-300 S / SIP
PAG OERLIKON AG
DISMANTLING / ASSEMBLY INSTRUCTIONS
D 02.05
19
22 14 15 16 12
1
5
21
12
10
7
33
8
19. Assembly of the flexure holder cpl.
(2/B04.01)
- Bring 2 auxiliary pins D4 [1] to the stop into the flexure holder cpl. {never touch the flexure sheets}
- Insert 2 auxiliary pins D4 [1] in the chassis, carefully lower the flexure holder cpl.
- Carefully fasten 4 flexure sheets (3/B04.01) with 4 screws (29/B04.01), 4 washers (5/B04.01) and
4 spring washers (6/B04.01) {2 pts. on the chassis, 2 pts. on the support piece}
- Turn the chassis cpl. on the front {sensor mechanism}
- Stick through 2 auxiliary pins D4 [1] up to the stop
- Carefully insert the other flexure holder on 2 auxiliary pins and lower onto the chassis
- Carefully fasten 4 flexure sheets (3/B04.01) with 4 screws (29/B04.01), 4 washers (5/B04.01) and
4 spring washers (6/B04.01) {2 pts. on the chassis, 2 pts. on the support piece}
20. Assembly of the flexure strap
(7/B04.01)
- Undo 2 screws [11] of the aligning bar [5], dismantle the aligning bar
- Remove 2 auxiliary pins D3 [1]
-
Specify the new flexure strap in accordance with page B 01.01
on page B 04.02-09 (item 7)
- Fasten the flexure strap with 2 screws (21/B04.01), 2 washers (5/B04.01) and 2 bases (8/B04.01) or 2
torsion protections (33/B04.01) {Fig. 8}
21. Assembly of the vane
(24/B04.01)
, the stopper
(22/B04.01)
and the connection wires
(26/B04.01)
- Tip the balance back into normal position {take care: push the auxiliary pins D4 back onto the flexure
holder}
- Screw the vane with brass screw (15/B04.01) and washer (16/B04.01) on the clear balance arm {vane
centred in the sensor mechanism slit}
- Undo the knurled nut [3a], undo the brass screw (15/B04.01) and turn the stopper (14/B04.01) 90° from
pot magnet
- Dismantle the auxiliary stop [3b], screw in the plastic stopper (22/B04.01) with a screwdriver No. 2 so far
that the stopper (14/B04.01) can again be turned 90° to the pot magnet
- Turn the stopper (14/B04.01) 90° to the pot magnet, tighten the brass screw (15/B04.01)
- Centre the stopper (14/B04.01) in the plastic stopper (22/B04.01) {Fig. 9}
- Solder in 2 connection wires on the signal coil board
22. Assembly of the chassis cpl.
(19/B04.01)
in the housing's bottom
- Take the chassis cpl. on the pot magnet and carefully insert into the housing's bottom
- Lock the chassis cpl. in the housing's bottom, tilt the housing's bottom on one side
- On the underneath of the housing's bottom screw on the chassis cpl. with 3 nuts (31/B04.01)
- Tip the housing's bottom cpl. back into normal position
Fig.8
Fig.9
Summary of Contents for 300 SCS series
Page 1: ...PAG OERLIKON AG The Balance of Quality SERVICE MANUAL SERIES 300 S 300 SCS 300 SIP...
Page 135: ...PAG OERLIKON AG SERIES 300 S SCS SIP MAIN BOARD 300 7218 010 HAUPTPRINT 300 7218 010 C 01 03...
Page 150: ...PAG OERLIKON AG SERIES 300 S SCS SIP MAIN BOARD 300 7235 010 HAUPTPRINT 300 7235 010 C 02 06...
Page 159: ...PAG OERLIKON AG SERIES 300 S SIP ANALOGUE BOARD 300 7219 010 ANALOGPRINT 300 7219 010 C 03 01...
Page 162: ...PAG OERLIKON AG SERIES 300 SCS ANALOGUE BOARD 300 7238 010 ANALOGPRINT 300 7238 010 C 04 01...
Page 194: ...SERIES 300 S SCS SIP PAG OERLIKON AG CALIBRATION INSTRUCTIONS D 04 11 Final control...