Charging temp min swi pool
(3818)
Temperatures that the collector must have at the least in order to begin charging
a swimming pool.
Charging prio storage tank
(3822)
For several combined exchangers in the system, the loading sequence for the
combined storage tank can be defined by setting the loading priority.
None:
each storage tank is loaded alternately for a temperature increase of 5°C,
until each setpoint has reached level A, B or C (see
Tab. 8 (Page 91)
). If all set-
points are reached, the setpoint of the next level is approached.
DHW storage tank:
The DHW storage tank is preferred during solar charging. It is
charged in each level A, B or C (see below) with priority. Only afterward is the fol-
lowing consumer in the same level charged. As soon as all setpoints in one level
are reached, the ones in the next level are approached, whereby the DHW storage
tank again has priority.
Buffer storage tank:
The buffer storage tank is preferred during soar charging. It is
charged in each level A, B or C (see
Tab. 8 (Page 91)
) with priority. Only after-
ward is the consumer next to it in the same level charged. As soon as all setpoints
in one level are reached, the ones in the next level are approached, whereby the
buffer storage tank again has priority.
Tab. 8: Storage tank setpoints
Level
DHW storage tank
Buffer storage
tank
A
1610 Nominal setpoint
Buffer setpoint (drag-pointer)
B
5050 DHW Charging temp max
4750 Buffer storage tank charging
temp max
C
DHW storage tank temp max (set
by factory: 90°C)
Buffer storage temperature max
(set by factory: 90°C)
Charging time relative prio
(3825)
If the preferred storage tank corresponding to the charging control not be charg-
ed, during the time set here the priority goes to the next storage tank or the
swimming pool.
Waiting time relative prio
(3826)
The transfer of the priority of the time set here is delayed.
Waiting time parallel op
(3827)
With sufficient solar capacity, with use of solar charging pumps a parallel opera-
tion is possible. During this the next storage tank in the priority sequence can be
loaded parallel to the current loaded storage tank. The storage tank switching on
for parallel operation can be delayed and staged by the value set here.
Delay secondary pump
(3828)
So that possible existing cold water can be first rinsed through the pump in the
primary circuit, the operation of the secondary pump of the heat exchanger can
be delayed.
Collector start function
(3830)
If the temperature at the collector with the pump turned off is not be measured
correctly (e.g. with vacuum tubes), then a periodic switching on of the pump is
possible.
The temperature on a certain collector cannot be measured correctly, if the pump
is switched-off. For this reason, the pump must be activated from time to time.
Programming
396532 05.11
Paramount three 30-115 kW
91
Summary of Contents for Gas condensing boiler
Page 1: ...Installation operation and maintenance manual Gas condensing boiler Paramount three 30 115 kW ...
Page 21: ...Fig 5 Connection plan Prior to installation 396532 05 11 Paramount three 30 115 kW 21 ...
Page 24: ...4 8 Legend Prior to installation 24 Paramount three 30 115 kW 396532 05 11 ...
Page 133: ...Space for notes 396532 05 11 Paramount three 30 115 kW 133 ...
Page 134: ...Space for notes 134 Paramount three 30 115 kW 396532 05 11 ...
Page 135: ...Space for notes 396532 05 11 Paramount three 30 115 kW 135 ...